Back to news
24 November, 2025
The sprayers are already fully prepared for winter storage.
The sprayers are already fully prepared for winter storage.
Our mechanics carried out a complete maintenance cycle: they flushed the system, ran antifreeze through all components, cleaned the equipment from any contamination, inspected the booms, filters, and valves, and lubricated all required points.
All to ensure that in spring the sprayers are ready to operate without any delays.
We also thank the farmers who responsibly followed all equipment preservation recommendations — the reliable performance of the machinery depends on it.
Our mechanics carried out a complete maintenance cycle: they flushed the system, ran antifreeze through all components, cleaned the equipment from any contamination, inspected the booms, filters, and valves, and lubricated all required points.
All to ensure that in spring the sprayers are ready to operate without any delays.
We also thank the farmers who responsibly followed all equipment preservation recommendations — the reliable performance of the machinery depends on it.